乌干达kingfisher(Uganda Kingfisher Project)

2024-04-11

1、 项目名称Project: KINGFISHER OIL FIELD FACILITIES PROJECT

           设施项目包括下列设施:

           1.1 Wellpads;1.2内场管线;1.3 CPF设施。

2、 设施简介Facilities:

The scope of project facilities shall cover the Kingfisher production and transmission system from the outlet of the well Christmas choke valves, downstream to the crude oil outlet flange of CPF, including well-pads, in-field flowlines and CPF.

The Kingfisher oil field facilities project shall comprise the following facilities:

2.1 Wellpads

There are 4 well-pads for the Kingfisher field facilities of the project: Pad 1-KF, Pad 2-KF,

Pad 3-KF, and Pad 4A-KF, with totally 20 production wells and 11 water injection wells.

2.2 Infield Flowlines

Each wellpad shall install a dedicated production line connected to CPF togather with other lines and cables. The flowlines and cables linking to the CPF shall be installed in a single corridor for each wellpad.

2.3 CPF Facilities

   The well-fluids from the Kingfisher field shall be transported to a Central Processing Facility (CPF) via flowlines from individual wellpads. The crude oil export facilities shall be designed to export 40,000 BOPD with BS&W of 0.5% (v) maximum.




分享